POWER SUPPLY DEPARTMENT OF PKP WARSZAWA ZACHODNIA.
A completed EL-INWEST project in the external power grids category, located in Warszawa.
ROLE OF EL-INWEST.
Power Supply Department of PKP Warszawa Zachodnia – realizations in the years 1992-1993.
Scope of work
- Power supply for the Łowicz traction substation overhead line 15kV with a length of 2 x 7km
- Power supply for the Sochaczew traction substation overhead line 15kV with a length of 2 x 3km
- Overhead line of non-traction needs Góra Kalwaria – Czachówek, Czachówek – Zalesie 15kV, length 15km
- Overhead line of non-traction needs of Brwinów – Pruszków 15kV, length 7km